
latest

2026
Civil
McKinney Soccer Complex
Installation of new cast-in-place concrete improvements associated with the McKinney Soccer Complex Phase II renovation. Work includes concrete sidewalks, pedestrian pathways, ADA-accessible routes, curb and gutter sections, flatwork around concession and restroom facilities, equipment pads, and related site concrete necessary to support the upgraded athletic complex. Concrete improvements are part of the overall modernization effort that includes spectator amenities, trail connections, site circulation enhancements, and support facilities throughout the complex.

2024
Civil
Princeton Park
Division 3 Concrete completed the concrete parking lot and associated site paving improvements for Princeton Park, delivering durable, high-quality surfaces designed for long-term performance, accessibility, and functionality.

2025
Tilt-Wall
Archangel Michael Coptic Orthodox Church
Division 3 Concrete provided tilt-wall construction for the Archangel Michael Coptic Orthodox Church expansion in Bedford, Texas. Our scope included the construction and erection of concrete wall panels, providing structural support for the new 10,757 SF sanctuary addition. The project required precision and coordination to integrate the new structure with the existing church campus while maintaining the architectural character of the facility.





